As you may or may not be aware, my condo was flooded last year on June 21st. There was 7 feet of water in there and reached almost to the ceiling. It has now been 1 year and 2 weeks since the flood and this is the state of the rebuild. It has been a long haul, and it looks like it will be a bit longer until I can move back in. I was told we would be in before the summer, well, that deadline was missed. Then we were told we would be in by July 4th. That is tomorrow, and by the looks of these pictures, that deadline will be missed. I don't have any expectations now that I will be in before the week of the 14th, but that might not be the case either. The City needs to sign off on the inspections, and the contractor does not want to bring them out until there are at least 2 completed units ready to go to grant occupancy. So, it is close, but still far away. I had a somewhat early welcome back to my condo gathering at a local pub with some of the people I work with at Ceramics Canada last night. Those people are fantastic and if you ever get a chance to go there for clay or other clay related items, they will help you out with all your clay needs. They truly are great.

Here are a few shots of the current state of the rebuild
This one shows the kitchen with the redone tall narrow cabinet, and the silly upper corner cabinet that needs to be revised...
And this one is of the partially completed bathroom. The toilet is in the bathtub right now to make room for the cabinet installer...
 

No comments:

Post a Comment